News Flash

Home

Posted on: May 14, 2019

TIGER BRIDGE WORK: Pawtucket St Inbound Detour 5/20/19 – April 2022

B50 Detour Route

Please be advised the City’s contractor will close the inbound direction of traffic on the Pawtucket St over Pawtucket Canal Bridge. The bridge will be reduced to one travel lane beginning Monday, May 20th. Only outbound traffic will continue through this one lane and inbound will be detoured at the intersection of Broadway Street and Pawtucket Street as shown on the attached drawing. The route will remain open to pedestrians at all times. This set up will remain in place until the contract end date of April 2022. This is part of the ongoing TIGER bridge replacement program.

Drivers who are unable to avoid the work areas should watch for construction signs and for directions from Police Officers and to be aware of moving equipment and workers in the road. Drivers should expect delays, closures, and be prepared to stop and proceed slowly through the construction zone and/or detour route. Detour signs will be posted for drivers to follow.

The City reminds everyone to please drive safely.

Any questions or concerns can be directed to the City of Lowell Engineering Department     (978-674-4070).


Facebook Twitter Email

Other News in Home