Sewer Connections

New sewer connections need to be reviewed by the Wastewater Engineering division to ensure that the new flow will not cause problems down the road. The amount of sewage a neighborhood can handle is restricted by the size of the sewer pipes, the slope of the ground, and other factors that must be assessed before new connections are approved.

To request review of a project, please contact the Engineering Manager, Mike Stuer, at (978) 674-1606.